Colocation infrastructure for submarine cable systems and telecommunications networks
Photo by Gerald Schombs on Unsplash

5 Things to Know About Colocation Agreements


As submarine cables rely on geographically distributed infrastructure— including cable landing stations, and increasingly points of presence (PoPs), and data centres — colocation agreements have evolved from relatively simple equipment-hosting frameworks into highly specialized contractual instruments governing complex technical, operational, and commercial interactions.


Unlike more standardized connectivity or bandwidth agreements such as Indefeasible Rights of Use (IRU) or Lease Capacity agreements, colocation contracts must address very concrete physical and operational realities. These may include the exact dimensions of cages or racks, electrical power allocation and pricing methodologies, personnel access protocols, interconnection rights, security requirements, and broader infrastructure sharing conditions that enable multiple customers to operate within the same facility.


Because of this operational specificity, colocation agreements tend to be among the most intricate and heavily cross-referenced contracts in telecommunications infrastructure transactions. Careful attention to detail during negotiation is therefore essential to avoid operational constraints or unintended commercial exposure later on.


This article highlights five key aspects that stakeholders should understand when negotiating and implementing colocation agreements.


  1. Ensure a Clear Contractual Structure


Colocation agreements may exist as standalone contracts or be embedded within broader multi-document contractual frameworks structured around a Master Services Agreement (MSA) governing other wholesale services. In practice, these frameworks typically include, among other elements, service order forms, technical schedules, operational appendices, pricing annexes and facility rulebooks.


This level of fragmentation — generally more pronounced than in capacity or bandwidth service agreements — reflects operational necessity but also introduces interpretative challenges, particularly when the individuals who originally negotiated the agreement are no longer with either the customer or the provider. Extensive cross-referencing is common, and inconsistencies between contractual layers frequently arise, specially where negotiations have focused on site-specific operational issues without fully harmonizing general provisions across all documents.


For example, an annex describing customer personnel access procedures may indicate that routine maintenance access is not permitted at weekends, while a separate appendix addressing emergency procedures may introduce exceptions. Similar tensions may appear in provisions governing interconnection rights, or in payment terms applicable to specific recurring charges.


In this context, the order of precedence clause assumes exceptional importance. While often overlooked during negotiations, it can prevent significant operational and legal difficulties after the agreement is signed. This clause establishes a hierarchy among contractual documents — such as schedules, exhibits, annexes and appendices — in the event of contradictions, thereby providing both legal certainty and operational predictability.


Given the highly technical and site-specific nature of colocation arrangements, this is far from a minor drafting issue. These agreements frequently incorporate elements drawn from different contractual traditions, including customized commercial lease provisions, industrial power supply arrangements with local energy providers, and equipment hosting or deposit-type frameworks. The result is a hybrid contractual instrument that requires careful structuring and disciplined document management.


From a practical standpoint, some provisions in colocation agreements should also be read with the principle of specificity in mind. Clauses negotiated in detail for a particular facility or operational scenario should generally prevail over broader template language addressing similar topics. In telecommunications wholesale transactions, detailed technical schedules often reflect the outcome of intensive negotiations around operational risk allocation, whereas general provisions may originate from earlier standard terms that were never fully updated. 


This situation may arise, for example, where different annexes include insurance requirements relating to customer’s equipment, but only one provides a more detailed framework — specifying maximum deductibles, geographic coverage and key exclusions. In such cases, the more specific provision is more likely to reflect the specific commercial understanding reached by the parties, even if more generic clauses remain elsewhere in the contractual documentation.



  1. Colocation as an Ancillary Arrangement


In submarine cable systems and high-capacity terrestrial backhaul networks, colocation agreements frequently operate as accessory arrangements that enable the practical use of capacity services.

Purchasers of IRU capacity often require physical space within cable landing stations to install the telecommunications equipment needed to manage their capacity, terminate circuits, and interconnect with other partners located nearby. As a result, it is common to see colocation service order forms executed at the same time as capacity service agreements, typically under the same Master Services Agreement but governed through separate annexes. Their duration is often aligned with the underlying IRU or lease capacity terms, which in the case of IRUs may extend for fifteen or even twenty years.

Because colocation of equipment is often critical to making capacity usable in practice, the contractual relationship between both services must be carefully structured. Agreements should clearly state how termination, suspension or breach in one service affects the other. 

In practice, this linkage should operate in both directions. A material breach in the provision of capacity services may render colocation commercially meaningless, while significant breaches of colocation obligations — such as failure to comply with power commitments — may jeopardize the effective use of capacity. Carefully designed linkage provisions can therefore serve as a meaningful deterrent against repeated breaches which, although minor in isolation, could ultimately undermine the reliability of capacity services provided to the customer’s own clients



  1. Interconnection and Cross-Connection Rights


While commercial terminology in infrastructure transactions is often used loosely — and may even vary from one country to another — colocation agreements differ materially from other contractual arrangements, particularly cable landing agreements. In practice, what truly matters is the substance of the contractual provisions rather than the title of the document (for example, “housing agreement” or “infrastructure sharing contract”).


However, the title should not be disregarded entirely. In some jurisdictions, the terminology used to characterize the agreement may have legal or regulatory implications. It may therefore be advisable to seek guidance from local regulatory counsel to ensure that the chosen contractual title does not inadvertently place the arrangement under a different regulatory regime, particularly where this could affect legally recognized interconnection rights or regulated fees applicable to customers.


Another common source of confusion is the distinction between colocation and cable landing rights. The latter typically govern the right to land submarine cables at a landing station and access coastal assets such as beach manholes. Although colocation may take place within cable landing stations, colocation rights do not confer landing rights.


One of the most sensitive aspects of any colocation agreement relates to interconnection rights. The ability to connect with other operators present at the same site is fundamental to ensuring network redundancy, commercial flexibility, and overall service resilience. For this reason, agreements should clearly define whether customers may interconnect freely with third parties and under what conditions cross-connection services are provided and priced.


A commonly negotiated provision may state, for example:


“Customer shall have the unrestricted right to establish, operate and maintain any interconnections and cross-connections with other systems, facilities, or customers (including non-landing parties to the cable station), without requiring prior consent from the Provider and without incurring additional charges or restrictions solely as a result of connecting with such third party, other than agreed charges for cross-connection services actually provided by the Provider.”


Similarly, contracts may address backhaul connectivity options from the facility, such as:

“Customer shall have the unrestricted right to contract with any third-party provider for backhaul services from the Site, without incurring charges, fees or restrictions from the Provider, other than those strictly required by applicable law. The Provider shall not impede, delay, or otherwise interfere with such arrangements and shall provide reasonable cooperation to enable such interconnections.”


If these rights are not clearly defined in the colocation agreement, customers may later find themselves operationally locked into restrictive conditions or facing unexpected interconnection costs.



  1. Power Supply


Electrical power provisioning can become a major and sometimes unexpected ancillary cost under a long-term colocation agreement if contractual provisions are not carefully drafted. Colocation contracts should clearly define power measurement methodologies, pricing adjustment mechanisms, and the consequences of exceeding or falling below committed power levels.


Minimum commitment clauses — sometimes resembling take-or-pay structures — may reflect legitimate infrastructure planning considerations for providers. However, they require careful calibration to avoid creating disproportionate financial exposure for customers over time, particularly where contractual terms extend for many years.


It is also advisable to clarify how common operational scenarios will be treated contractually, rather than leaving room for future interpretation disputes. For example, the agreement should distinguish between increases resulting from external regulatory or utility changes generally applicable to the supply of electricity and increases resulting from circumstances internal to the provider, such as the addition of new customers or a tariff reclassification caused by changes in the provider’s aggregate consumption. The latter should not automatically be passed through to an existing colocation customer whose own consumption has not changed.


A provision frequently negotiated in this context may read:


“For the avoidance of doubt, any change in the electricity tariff or other costs incurred by Provider as a result of a reclassification of Provider’s user level, the addition of new customers, or any internal change not directly related to Customer’s power consumption shall not entitle Provider to increase the charges payable by Customer under this Agreement. Only increases in energy costs directly attributable to Customer’s actual consumption or to third-party regulatory or utility changes generally applicable to the delivery of energy to the Site shall be passed through to Customer.”



  1. Personnel Access


Personnel access provisions are critical to ensuring the operational continuity of a customer’s network. In practice, some customers only realize too late that routine visits during weekends or holidays may involve additional charges, or that escalation procedures for urgent maintenance interventions are unclear or insufficient.


In many cases, access procedures are described in separate operational annexes or facility rulebooks. Some providers may even reference documents published on their websites, allowing them to update procedures unilaterally over time. While this approach may offer operational flexibility to the provider, it can create uncertainty for customers relying on stable access conditions.


During contract negotiations, it is therefore advisable for customers to request that the applicable access procedures be formally incorporated into the agreement, for example by attaching the current version as an annex. Parties may also wish to agree that future modifications by the colocation provider should not materially restrict the customer’s established access rights without prior agreement.



Conclusions


Colocation agreements are often perceived as secondary or purely operational documents within the telecommunications wholesale industry. In reality, they play a critical role in determining how submarine cable systems and supporting infrastructure are deployed, interconnected and maintained over time.


Because these agreements regulate highly practical aspects of infrastructure use — from power consumption and physical space to interconnection rights and personnel access — their contractual structure tends to be more complex than many other telecommunications service agreements. Multiple annexes, operational procedures and technical schedules often coexist within the same framework, making clarity and internal consistency essential.


As this article has highlighted, a few key areas deserve particular attention: establishing a clear contractual hierarchy among documents, ensuring colocation contracts are properly aligned with underlying capacity agreements, preserving interconnection flexibility, carefully structuring power supply provisions, and securing reliable access for operational personnel.

Addressing these issues during the negotiation phase is far easier than attempting to resolve them once equipment has been deployed and network dependencies have been established. In colocation, details that may appear secondary during negotiations can become critical once the network is operational.




Andrés Fígoli  the Director of Fígoli Consulting

Andrés Fígoli is the author of the two-volume book “Legal and Regulatory Aspects of Telecommunication Submarine Cables” and is the director of Fígoli Consulting, where he provides legal and regulatory advice on all aspects of subsea cable work. Mr. Fígoli graduated in 2002 from the Law School of the University of the Republic (Uruguay), holds a Master of Laws (LLM) from Northwestern University, and has worked on submarine cable cases for more than 20 years in a major wholesale telecommunication company. He also served as Director and Member of the Executive Committee of the International Cable Protection Committee (2015-2023).


This article was first published in Submarine Telecoms Forum Magazine #152 – November 2026.



Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

Subscribe to Our Newsletter

Thanks for submitting!

  • Youtube
  • LinkedIn
  • Twitter
  • Instagram
Logo igoli Consulting

©2026 Fígoli Consulting

bottom of page